Creativity & Innovation
BLACK ROCK CITY BY THE NUMBERS
THE EXPERIENCES WE SHARE IN BLACK ROCK CITY AND BEYOND ARE IMPOSSIBLE TO QUANTIFY. AT THE SAME TIME, THE SHEER NUMBERS — THE SIZE OF THE CITY, THE NUMBER OF PROJECTS AND CONTRIBUTORS TO VARIOUS TEAMS — ARE SIGNIFICANT. AND EVERY PART IS ESSENTIAL TO BRINGING THE ENTIRETY OF OUR DUSTY METROPOLIS TO LIFE.
SHAPE AND SIZE OF THE CITY:
- 2023 PEAK POPULATION WAS 74,126
- BRC WAS 3,879 ACRES, OR 6.06 SQUARE MILES
- 1.74 SQUARE MILES OF CITY GRID
- 9.5 MILES OF TRASH FENCE ENCIRCLED THE CITY
- 1,700 PORTA-POTTIES WERE INSTALLED
FIRE CONCLAVE:
- 25 FIRE TROUPES CHOSEN TO PERFORM
- 5 ASKED TO STAND SENTINEL
ART:
- 383 ART PROJECTS
- 71 HONORARIA
- 56 INTERNATIONAL ARTWORKS
- FROM 28 COUNTRIES & 26 US STATES
- 9 PROJECTS BURNED (INCLUDING THE MAN & TEMPLE)
- 4 ARTWORKS DIDN’T BURN AS PLANNED (DUE TO RAIN)
THE DEPARTMENT OF MUTANT VEHICLES LICENSED:
- 40 DAYTIME MUTANT VEHICLES
- 15 NIGHTTIME MUTANT VEHICLES
- 506 DAY AND NIGHT MUTANT VEHICLES
SUSTAINABILITY IN BRC OPERATIONS:
- 7MWH OF SOLAR GENERATED YEAR-ROUND
- 7,400 GALLONS OF RENEWABLE FUEL TESTED
- 60 SCARAB MOBILE SOLAR TRAILERS
- 26% REDUCTION IN FUEL USE FOR DPW GRID
- ALL FUNDED BY GENEROUS DONATIONS TO THE OFF FOSSIL FUELS PROGRAM
CAMPS & VILLAGES PLACED:
- 1,242 THEME CAMPS & VILLAGES
- 120 ART SUPPORT CAMPS
- 126 MUTANT VEHICLE SUPPORT CAMPS
- 33 WORK SUPPORT CAMPS
- 256 FIRST-YEAR CAMPS
RECYCLING IN BRC:
- 9,000 LBS (ESTIMATED) OF ALUMINUM CANS DROPPED OFF OF BY PARTICIPANTS
- $2,500 DONATED TO THE GERLACH K-12 SCHOOL
BLACK ROCK CITIZENS:
(Based on 2023 BRC Census)
- 43% WERE FIRST-TIME BRC PARTICIPANTS
- 14% LIVE OUTSIDE THE US & CANADA
- 14% ARRIVED VIA THE BURNER EXPRESS BUS
- 47% POWERED THEIR CAMPS WITH SOLAR
- 80% PRACTICE THE 10 PRINCIPLES IN DAILY LIFE